• 紫光阁中共中央国家机关工作委员会 2019-06-15
  • 自己回敬自己······大家都醉了······[哈哈] 2019-06-15
  • 计划确定之后,还需要落实,就要求计划所涵盖的所有因素都按预订的方案对接转化,尤其是计划所涉及的人一定要达到相应的要求并严格按计划开展活动…… 2019-06-13
  • 欢乐“粽”情过端午 尽情放“粽”嗨起来 2019-06-12
  • 党报社长、总编辑祝贺人民日报创刊70周年 2019-05-24
  • 国酒茅台·国之栋梁 希望工程圆梦行动获第十二届人民企业社会责任奖年度案例奖 2019-05-24
  • 法制日报:集体征收燃油附加费值得商榷 2019-05-21
  • 林海起诉海底捞侵权 对方回应:已停止播放其音乐作品 2019-05-21
  • 澳门修订《司法组织纲要法》,涉国安法案件限中国籍法官审理 2019-05-09
  • 揭秘人民币制作过程 从“白纸”到钞票耗时1个月 2019-05-06
  • 候选企业:淄博华光陶瓷科技文化有限公司 2019-05-06
  • 图说互联网(29期):春运购票谨防网络骗局 2019-04-19
  • 桃之“妖妖”:古人为什么相信桃木可以驱妖辟邪? 2019-04-14
  • 陶方启:推进农业供给侧改革促乡村振兴 2019-04-14
  • An advance booking of two hours can be made for Yangtze River Cableway tickets - Chongqing News - CQNEWS 2019-04-12
  • 制造

    内马尔在哪个俱乐部 www.pgpk.net Location:Home>Manufacture

    Human Resources
    GDXL has  300 skillful employees working for processing.
    60% employees have been working in GDXL over 5 years.
    27% employees have been working in GDXL over 10 years.
    6% employees have been working in GDXL over 15 years.
    35% employees have been holding a diploma or a higher degree.
    Processing Equipment
    Use of the international first-class high-precision processing equipment, more than 85% of the production processing is using automatic CNC processing equipments.
    Japanese horizontal machining equipment
    Swiss high-precision grinding equipment
    Swiss EDM machine
    Swiss WEDM-LS machine
    USA CNC lathing equipment
    Japanese milling equipment
    Swiss grilling equipment
    Vacuum heat treatment furnace
    German 5 axial machining equipment
    German vertical machining equipment
    Production Management
    GDXL dedicates pursuing high-grade management and promoting automatic manufacturing workshop as a goal; aiming to improve our data management, machine operation, products efficiency, quality, safety, and cost saving etc.
    Resources System
    GDXL uses PLM and ERP system to manage and arrange our daily datum, documents, resource distribution, etc.
    Quality Control system
    GDXL has a quality control department to oversee all inspection procedure that makes sure every single component in high quality before delivery to our customers.
    Inspection Facilities
    GDXL inspection centre has over 60 high precision inspection instruments and R&D instruments which are all over US$ 2,000,000.
    Production
    Lead-time
    Schematic diagram of mold testing and product testing
    flow chart
    Cold-fill blow mold: less than 200 cavities, 25 days
    HR blow mold: less than 100 cavities, 30 days
    Preform mold: 72 cavities, 45 days
    Preform mold: 96 cavities, 50 days
    Closure mold: 60 days
    Hot runner: 70 days
    Semi-finished
    Product Inventory
    Blow mold: 8,000 – 10,000 cavities standardized semi-finished products Peform mold: 40 sets 32 – 144 cavities standardized semi-finished products
    Capacity
    Blow mold:30,000 cavities per year
    Preform mold: 20,000 cavities per year
    Closure mold: 3,000 cavities per year.
    Back to Top
  • 紫光阁中共中央国家机关工作委员会 2019-06-15
  • 自己回敬自己······大家都醉了······[哈哈] 2019-06-15
  • 计划确定之后,还需要落实,就要求计划所涵盖的所有因素都按预订的方案对接转化,尤其是计划所涉及的人一定要达到相应的要求并严格按计划开展活动…… 2019-06-13
  • 欢乐“粽”情过端午 尽情放“粽”嗨起来 2019-06-12
  • 党报社长、总编辑祝贺人民日报创刊70周年 2019-05-24
  • 国酒茅台·国之栋梁 希望工程圆梦行动获第十二届人民企业社会责任奖年度案例奖 2019-05-24
  • 法制日报:集体征收燃油附加费值得商榷 2019-05-21
  • 林海起诉海底捞侵权 对方回应:已停止播放其音乐作品 2019-05-21
  • 澳门修订《司法组织纲要法》,涉国安法案件限中国籍法官审理 2019-05-09
  • 揭秘人民币制作过程 从“白纸”到钞票耗时1个月 2019-05-06
  • 候选企业:淄博华光陶瓷科技文化有限公司 2019-05-06
  • 图说互联网(29期):春运购票谨防网络骗局 2019-04-19
  • 桃之“妖妖”:古人为什么相信桃木可以驱妖辟邪? 2019-04-14
  • 陶方启:推进农业供给侧改革促乡村振兴 2019-04-14
  • An advance booking of two hours can be made for Yangtze River Cableway tickets - Chongqing News - CQNEWS 2019-04-12