• 高清:江西南昌志愿者爱心陪伴特殊儿童 2019-08-14
  • 艺术思考不能做结论式、判断式的表述 2019-08-14
  • 东风Honda INSPIRE下半年将量产 内外兼修成就旗舰 2019-08-08
  • 傍晚,听一曲温柔的天鹅湖 2019-08-08
  • 新疆公益组织,公益求助,晨报救命血联盟 2019-08-02
  • 空军飞行员大秀超低空飞行,场面震撼堪比大片 2019-08-01
  • 我们的国际主义义务就是让那受苦受难的中东人去欧洲过上幸福,美好的生活。到中国来,又不自由,又不民主,茶叶蛋都吃不上,来干嘛泥? 2019-08-01
  • 你咋看高考大数据专业成热门? 2019-07-18
  • 不可思议!日本八幡平现“龙眼”奇景 2019-07-18
  • 学生睡觉摔骨折 法院主动出击促调解 2019-07-17
  • “哲学与新时代:庆祝改革开放40周年”研讨会暨第十五届马克思主义哲学创新论坛召开 2019-07-17
  • 站在重要历史时刻的旁边  2019-07-07
  • 五一游记:随华商网乡村游走进安康 游览南宫山 蜀河古镇 2019-07-07
  • 新时代的政治宣言和行动纲领 2019-06-29
  • 荆州全力推进“四路三桥”建设 前5月累计完成投资178亿元 2019-06-29
  • 制造

    内马尔在哪个俱乐部 www.pgpk.net Location:Home>Manufacture

    Human Resources
    GDXL has  300 skillful employees working for processing.
    60% employees have been working in GDXL over 5 years.
    27% employees have been working in GDXL over 10 years.
    6% employees have been working in GDXL over 15 years.
    35% employees have been holding a diploma or a higher degree.
    Processing Equipment
    Use of the international first-class high-precision processing equipment, more than 85% of the production processing is using automatic CNC processing equipments.
    Japanese horizontal machining equipment
    Swiss high-precision grinding equipment
    Swiss EDM machine
    Swiss WEDM-LS machine
    USA CNC lathing equipment
    Japanese milling equipment
    Swiss grilling equipment
    Vacuum heat treatment furnace
    German 5 axial machining equipment
    German vertical machining equipment
    Production Management
    GDXL dedicates pursuing high-grade management and promoting automatic manufacturing workshop as a goal; aiming to improve our data management, machine operation, products efficiency, quality, safety, and cost saving etc.
    Resources System
    GDXL uses PLM and ERP system to manage and arrange our daily datum, documents, resource distribution, etc.
    Quality Control system
    GDXL has a quality control department to oversee all inspection procedure that makes sure every single component in high quality before delivery to our customers.
    Inspection Facilities
    GDXL inspection centre has over 60 high precision inspection instruments and R&D instruments which are all over US$ 2,000,000.
    Production
    Lead-time
    Schematic diagram of mold testing and product testing
    flow chart
    Cold-fill blow mold: less than 200 cavities, 25 days
    HR blow mold: less than 100 cavities, 30 days
    Preform mold: 72 cavities, 45 days
    Preform mold: 96 cavities, 50 days
    Closure mold: 60 days
    Hot runner: 70 days
    Semi-finished
    Product Inventory
    Blow mold: 8,000 – 10,000 cavities standardized semi-finished products Peform mold: 40 sets 32 – 144 cavities standardized semi-finished products
    Capacity
    Blow mold:30,000 cavities per year
    Preform mold: 20,000 cavities per year
    Closure mold: 3,000 cavities per year.
    Back to Top
  • 高清:江西南昌志愿者爱心陪伴特殊儿童 2019-08-14
  • 艺术思考不能做结论式、判断式的表述 2019-08-14
  • 东风Honda INSPIRE下半年将量产 内外兼修成就旗舰 2019-08-08
  • 傍晚,听一曲温柔的天鹅湖 2019-08-08
  • 新疆公益组织,公益求助,晨报救命血联盟 2019-08-02
  • 空军飞行员大秀超低空飞行,场面震撼堪比大片 2019-08-01
  • 我们的国际主义义务就是让那受苦受难的中东人去欧洲过上幸福,美好的生活。到中国来,又不自由,又不民主,茶叶蛋都吃不上,来干嘛泥? 2019-08-01
  • 你咋看高考大数据专业成热门? 2019-07-18
  • 不可思议!日本八幡平现“龙眼”奇景 2019-07-18
  • 学生睡觉摔骨折 法院主动出击促调解 2019-07-17
  • “哲学与新时代:庆祝改革开放40周年”研讨会暨第十五届马克思主义哲学创新论坛召开 2019-07-17
  • 站在重要历史时刻的旁边  2019-07-07
  • 五一游记:随华商网乡村游走进安康 游览南宫山 蜀河古镇 2019-07-07
  • 新时代的政治宣言和行动纲领 2019-06-29
  • 荆州全力推进“四路三桥”建设 前5月累计完成投资178亿元 2019-06-29
  • 快乐扑克3走势图山东 江苏快三玩法总共多少 湖南快乐十分图表 体彩ding刮乐代码 辽宁35选7字谜 买彩票中奖 大乐透走势图浙江 带来好运的微信头像花 山东十一选五计划群 六肖中特不改料 3d推荐号码 江西快3开奖结果走势图 云南快乐10分开奖结果 彩票开奖代码 百灵手游官网百人牛牛