• 图说互联网(29期):春运购票谨防网络骗局 2019-04-19
  • 桃之“妖妖”:古人为什么相信桃木可以驱妖辟邪? 2019-04-14
  • 陶方启:推进农业供给侧改革促乡村振兴 2019-04-14
  • An advance booking of two hours can be made for Yangtze River Cableway tickets - Chongqing News - CQNEWS 2019-04-12
  • 长城新媒体集团有限公司承德记者站招聘公告 2019-03-16
  • 周立波“涉毒涉枪案”最终宣判 2019-03-16
  • ST海润逾期债务累计近27亿 高管大调整后集体降薪为保壳 2019-03-10
  • 具奋垄断因素的市场经济是变种的市场经济,这种市场经济不可能实现资源合理配置,只会造成畸形发展,导致社会经济的恶性病变。房地产市场现状是最好例证。 2019-02-22
  • 【央视快评】让传统文化焕发新时代风采 2019-02-02
  • 县名解析:朔州山阴县县名来历 2019-02-02
  • 呼死你团伙被摧毁 封停83万余个账号抓获210余人 2018-12-29
  • 制造

    内马尔在哪个俱乐部 www.pgpk.net Location:Home>Manufacture

    Human Resources
    GDXL has  300 skillful employees working for processing.
    60% employees have been working in GDXL over 5 years.
    27% employees have been working in GDXL over 10 years.
    6% employees have been working in GDXL over 15 years.
    35% employees have been holding a diploma or a higher degree.
    Processing Equipment
    Use of the international first-class high-precision processing equipment, more than 85% of the production processing is using automatic CNC processing equipments.
    Japanese horizontal machining equipment
    Swiss high-precision grinding equipment
    Swiss EDM machine
    Swiss WEDM-LS machine
    USA CNC lathing equipment
    Japanese milling equipment
    Swiss grilling equipment
    Vacuum heat treatment furnace
    German 5 axial machining equipment
    German vertical machining equipment
    Production Management
    GDXL dedicates pursuing high-grade management and promoting automatic manufacturing workshop as a goal; aiming to improve our data management, machine operation, products efficiency, quality, safety, and cost saving etc.
    Resources System
    GDXL uses PLM and ERP system to manage and arrange our daily datum, documents, resource distribution, etc.
    Quality Control system
    GDXL has a quality control department to oversee all inspection procedure that makes sure every single component in high quality before delivery to our customers.
    Inspection Facilities
    GDXL inspection centre has over 60 high precision inspection instruments and R&D instruments which are all over US$ 2,000,000.
    Production
    Lead-time
    Schematic diagram of mold testing and product testing
    flow chart
    Cold-fill blow mold: less than 200 cavities, 25 days
    HR blow mold: less than 100 cavities, 30 days
    Preform mold: 72 cavities, 45 days
    Preform mold: 96 cavities, 50 days
    Closure mold: 60 days
    Hot runner: 70 days
    Semi-finished
    Product Inventory
    Blow mold: 8,000 – 10,000 cavities standardized semi-finished products Peform mold: 40 sets 32 – 144 cavities standardized semi-finished products
    Capacity
    Blow mold:30,000 cavities per year
    Preform mold: 20,000 cavities per year
    Closure mold: 3,000 cavities per year.
    Back to Top
  • 图说互联网(29期):春运购票谨防网络骗局 2019-04-19
  • 桃之“妖妖”:古人为什么相信桃木可以驱妖辟邪? 2019-04-14
  • 陶方启:推进农业供给侧改革促乡村振兴 2019-04-14
  • An advance booking of two hours can be made for Yangtze River Cableway tickets - Chongqing News - CQNEWS 2019-04-12
  • 长城新媒体集团有限公司承德记者站招聘公告 2019-03-16
  • 周立波“涉毒涉枪案”最终宣判 2019-03-16
  • ST海润逾期债务累计近27亿 高管大调整后集体降薪为保壳 2019-03-10
  • 具奋垄断因素的市场经济是变种的市场经济,这种市场经济不可能实现资源合理配置,只会造成畸形发展,导致社会经济的恶性病变。房地产市场现状是最好例证。 2019-02-22
  • 【央视快评】让传统文化焕发新时代风采 2019-02-02
  • 县名解析:朔州山阴县县名来历 2019-02-02
  • 呼死你团伙被摧毁 封停83万余个账号抓获210余人 2018-12-29